Programs Energetic
An innovative online platform that brings together experienced brokers/agents specializing in projects related to renewable energy sources and hydrogen energy.
Emission-Free Power Plant
Our business model allows you to completely abstain from purchasing black energy, gas, and fossil fuels and to reduce energy purchasing costs by 30-50% without any investment on your part.
Energy and Hydrogen HUB
Green Energy Hybrid Power Plant is our innovative proposal for everyone looking for effective and ecological solutions in the field of energy production.
Zero-Emission Power Plant (BSE)
HYBRID POWER PLANT
A ZERO-EMISSION POWER PLANT (BSE) is several times more efficient than other known market solutions for energy production. A sample ZERO-EMISSION POWER PLANT module has a nominal power of 5 MW (productivity: 8760 hours x 5 MW = 43,800 MWh/year) and consists of 10 generators with a continuous power of 5 MW, operating steadily 24 hours a day. The land usage for a 5 MW power plant is small, around 2500 m². The Zero-Emission Power Plant can be built with any power capacity in the range of 1 – 50 MW by combining many smaller modules.
A 5 MW ZERO-EMISSION POWER PLANT and a 45 MW PV – Photovoltaic Power Plant have similar annual energy production. Project parameters:
- Productivity: BSE – 1 MW = 8760 MWh/year, PV – 1 MW = 1100 MWh/year;
- Investment/land area: BSE – 0.25 ha, PV – 35 ha;
- Energy production stability: BSE – stable – 24 hours/day, PV – unstable – only works on sunny days;
- Time to obtain a building permit: BSE – 0.5 years, PV – minimum 1.5 years.
Both BSE and PV produce environmentally friendly energy. Energy costs for the end customer are 30-50% lower (depending on the terms of cooperation) than current market prices. We fully finance the investment process of the “Free Energy Transformation” Program ourselves. BSE has full investment funding without the involvement of the end customer’s capital.
TEAMID.EU
ENERGY TRANSFORMATION PROGRAMS
TVGREEN.EU
WATCH THE VIDEO
OF INNOVATIVE TECHNOLOGIES
projects, documentation, events, visions, aspirations, ideas, concepts, and achievements of the Green Energy PL Energy Group
BECOME A PARTNER OF THE ENERGY TRANSFORMATION
Contact us if you are interested in cooperation in the field of Energy Transformation.
GROUP IN THE WORLD
Achievements Groups
Investment in the world
+ 2 GW
Number built
energy projects
+ 6 TWh
Quantity sold
energy per year
OUR REFERENCES
180 +
Strategies and Expert Work
50 +
Business
Projects
150 +
Completed
EU grants
25 +
Conferences and Training Sessions
NEWSID.org
FROM
THE ENERGY
MARKET AND BUSINESS
A nuclear power plant in Poland may be faster. New government solutions
The Council of Ministers adopted a draft act amending the Act on the preparation and implementation of investments in nuclear energy facilities and accompanying investments and certain other acts. It is intended to shorten the certification time and, consequently, the nuclear construction process itself by 1-1.5 years. However, the work on the project itself took over a year.
źródło: NewsID.org
Karpacz Economic Forum. Discussion panel “Realism and values in politics”
The next Europe of the Carpathians conference will take a special place in the program of the 31st edition of the Economic Forum in Karpacz. Over the course of its history, the thematic scope of the conference has systematically expanded. This year, one of the discussion panels will be a debate on contemporary political thought.
źródło: NewsID.org
Fewer people want to use electricity from the sun. The energy revolution is slowing down
ecords in solar energy production are not accompanied by record interest in subsidies under the “My Electricity” program. This trend may be changed by high energy prices, which will once again encourage more Poles to make new investments.
źródło: NewsID.org